Commercial Projects
Hampton Mechanical Inc
Our Commercial Projects
Arsenal 201
General Contractor: Franjo Construction
Size of Job: 612,331 sq ft
Completion Date: 22/11/2022
Description: HMI installed 343 apartment one-to-one split systems and associated ductwork, fans and grilles. Along with this, our team completed eight mini split systems and the installation of 36 common space one-to-one split systems and associated ductwork and grilles.
Cambridge Square Building 7
General Contractor: TBD
Size of Job: TBD
Completion Date: TBD
Description: TBD
Steel City Squash
General Contractor: PJ Dick
Size of Job: 19242 sq ft
Completion Date: 24/06/2024
Description: HMI installed (2) Aaon Dedicated Outdoor Air Units and all associated ductwork and motorized dampers. Our team installed an LG VRF System that included (5) LG Outdoor Heat Recovery Units tied into (16) LG Multi V Fan Coil Units along with all associated ductwork and grilles.
Light of Life
General Contractor: Martik Brothers Inc.
Size of Job: 56,185 sq ft
Completion Date: 23/09/2023
Description: HMI installed (2) Aaon Dedicated Outdoor Air Units and all associated Ductwork and Grilles. Our team also installed a Daikin VRV System that included (9) Outdoor Heat Recovery Units and (47) Indoor VRV Units with a central controller. We also installed a Type 2 Grease hood with Makeup Air, Exhaust Fan, and all welded grease duct that passed all City of Pittsburgh Inspection requirements.
Castlegate Green
General Contractor: Sota Construction
Size of Job: (7) Multi Family Buildings and (1) Community Building
Completion Date: 28/06/2024
Description: HMI completed the installation of (53) Goodman 1 to 1 Split System Heat Pumps and all associated ductwork, grilles, and exhaust systems with air cycling timers. This project was for PHFA and Energy Star, we passed all required blower door testing to meet Energy Star requirements.
Allegheny Branch House Lofts
General Contractor: Mistick Construction
Size of Job: 47,181 sq ft
Completion Date: 26/04/2024
Description: HMI installed 42 fan coil units with heat pumps for all apartments with all associated ductwork, grilles, and diffusers. The design had one roof-mounted makeup air unit with energy recovery. This project also had 1 ducted horizontal fan coil unit, 3 ductless wall-mounted fan coil units, and 2 ceiling-mounted cassette units. Each of these units were wired into their own individual thermostats.
Flats on Forward
General Contractor: P.J. Dick
Size of Job: 24,809 sq ft
Completion Date: 15/10/2023
Description: Our team installed (2) Energy Recovery units and (1) Make Up Air Unit with all associated ductwork, fire dampers, and fire smoke dampers. Installation of a Daikin VRV system that included (3) Outdoor Heat Recovery Units and (54) Indoor units, all on a central controller tied into thermostats in each individual apartment.
Goldfish Swim School
General Contractor: A.W. McCay Contracting Inc.
Size of Job: 2,937 sq ft
Completion Date: 02/07/2021
Description: When we started this project in January of 2021, we were excited to get things moving in the new year. By July, we had finished our rooftop installments with Trane RTUs and Aaon DHUs, along with ductwork wrapped with DuctSox for the interior of the space. Electric duct heaters, exhaust fans, and intake hoods were involved for optimal conditions within the indoor pool area. To keep all of the little fish comfortable, HMI performed air balancing and controls that ensured proper air flow and temperature.
The Crossings at Harts Run
General Contractor: March-Westin Company, Inc.
Size of Job: 336,672 sq ft
Completion Date: 26/06/2021
Description: Hampton Mechanical mobilized on this project in August of 2019. We successfully coordinated our service through 2020 on this large, assisted living facility. This project included 194 living spaces for tenents that contains a kitchen, living room, bedroom, bathroom, and additional amenities for larger units. We installed an army of rooftop air handling units, split system heat pumps, and ductwork throughout the entire facility. We also accommodated the dining area with a full-service kitchen hood and vent systems. We are happy to provide a comfortable living facility for our elder community.
Personalized Skin Solutions
General Contractor: Turner Construction Company
Size of Job: 144,000 sq ft
Completion Date: 20/05/2021
Description: This design-build project was our first experience with Turner Construction, and has been a great success thus far. After we provided the design, Turner took over to break ground on this large fulfillment and distribution center for Personalized Skin Solutions, also affiliated with the popular skincare brand Curology. Being close to the airport, there were many different hurdles to get over involving the lift for our equipment. After coordinating with airport and local authorities, we were able to start our work on schedule. The design included a Unistrut grid ceiling, office space, compound labs, and distribution space for this quick-growing company.
Doughboy Apartments
General Contractor: Nelcon Inc.
Architect: Desmone & Associates Architects; Terry Oden
Project Type: Multi-Family Housing
Completion Date: 20/05/2021
2554 Smallman
General Contractor:
Architect:
Project Type:
Completion Date:
Atria Senior Living Facility
General Contractor: Mistick Construction.
Architect: PRDG, LLC
Project Type: Senior Living Facility
Brewers Block
General Contractor: DC
Architect: Desmone
Project Type: Multifamily
Range USA
General Contractor: Rycon Construction, Inc.
Architect: ESD Architecture, HELT Design
Project Type: Retail
Cohatch Southside Works
General Contractor: Franjo Construction
Architect: IKM Incorporated
Project Type: Office Space
Radiance Fertility Clinic
General Contractor: Citadel Construction Group
Size: 7,570 sq ft
Project Type: Office Space
RIZE Sports
General Contractor: Citadel Construction Group
Size: 57,220 sq ft
Project Type: Recreational
Triangle Building
General Contractor:
Size:
Project Type:
2912 East Carson Showroom
General Contractor: Franjo Construction Builders
Size: 11,492 sq ft
Project Type: Desmone
Central Outreach Wellness Center
General Contractor: Citadel Construction Group
Architect: WTW Architects
Size: 7,000 sq ft
Dick's House of Sport
General Contractor: Rycon Construction
Architect: Fox Design Group
Size: 148,000 sq ft






















