Commercial Projects

Hampton Mechanical Inc

Arsenal 201


General Contractor:  Franjo Construction

Size of Job:  612,331 sq ft

Completion Date:  22/11/2022

Description: HMI installed 343 apartment one-to-one split systems and associated ductwork, fans and grilles. Along with this, our team completed eight mini split systems and the installation of 36 common space one-to-one split systems and associated ductwork and grilles.

Cambridge Square Building 7


General Contractor: TBD

Size of Job:  TBD

Completion Date:  TBD

Description:  TBD

Steel City Squash


General Contractor:   PJ Dick

Size of Job:  19242 sq ft

Completion Date:  24/06/2024

Description:  HMI installed (2) Aaon Dedicated Outdoor Air Units and all associated ductwork and motorized dampers. Our team installed an LG VRF System that included (5) LG Outdoor Heat Recovery Units tied into (16) LG Multi V Fan Coil Units along with all associated ductwork and grilles.

Light of Life


General Contractor:  Martik Brothers Inc.

Size of Job:  56,185 sq ft

Completion Date:  23/09/2023

Description:  HMI installed (2) Aaon Dedicated Outdoor Air Units and all associated Ductwork and Grilles. Our team also installed a Daikin VRV System that included (9) Outdoor Heat Recovery Units and (47) Indoor VRV Units with a central controller. We also installed a Type 2 Grease hood with Makeup Air, Exhaust Fan, and all welded grease duct that passed all City of Pittsburgh Inspection requirements.

Castlegate Green


General Contractor:   Sota Construction

Size of Job:  (7) Multi Family Buildings and (1) Community Building

Completion Date:  28/06/2024

Description:  HMI completed the installation of (53) Goodman 1 to 1 Split System Heat Pumps and all associated ductwork, grilles, and exhaust systems with air cycling timers. This project was for PHFA and Energy Star, we passed all required blower door testing to meet Energy Star requirements.

Allegheny Branch House Lofts


General Contractor:   Mistick Construction

Size of Job:   47,181 sq ft

Completion Date:  26/04/2024

Description:  HMI installed 42 fan coil units with heat pumps for all apartments with all associated ductwork, grilles, and diffusers. The design had one roof-mounted makeup air unit with energy recovery. This project also had 1 ducted horizontal fan coil unit, 3 ductless wall-mounted fan coil units, and 2 ceiling-mounted cassette units. Each of these units were wired into their own individual thermostats.

Flats on Forward


General Contractor:  P.J. Dick

Size of Job:  24,809 sq ft

Completion Date:  15/10/2023

Description: Our team installed (2) Energy Recovery units and (1) Make Up Air Unit with all associated ductwork, fire dampers, and fire smoke dampers. Installation of a Daikin VRV system that included (3) Outdoor Heat Recovery Units and (54) Indoor units, all on a central controller tied into thermostats in each individual apartment.

Goldfish Swim School


General Contractor:  A.W. McCay Contracting Inc.

Size of Job:  2,937 sq ft

Completion Date:  02/07/2021

Description: When we started this project in January of 2021, we were excited to get things moving in the new year. By July, we had finished our rooftop installments with Trane RTUs and Aaon DHUs, along with ductwork wrapped with DuctSox for the interior of the space. Electric duct heaters, exhaust fans, and intake hoods were involved for optimal conditions within the indoor pool area. To keep all of the little fish comfortable, HMI performed air balancing and controls that ensured proper air flow and temperature.

The Crossings at Harts Run


General Contractor:  March-Westin Company, Inc.

Size of Job:  336,672 sq ft

Completion Date:  26/06/2021

Description: Hampton Mechanical mobilized on this project in August of 2019. We successfully coordinated our service through 2020 on this large, assisted living facility. This project included 194 living spaces for tenents that contains a kitchen, living room, bedroom, bathroom, and additional amenities for larger units. We installed an army of rooftop air handling units, split system heat pumps, and ductwork throughout the entire facility. We also accommodated the dining area with a full-service kitchen hood and vent systems. We are happy to provide a comfortable living facility for our elder community.

Personalized Skin Solutions


General Contractor:  Turner Construction Company

Size of Job: 144,000 sq ft

Completion Date:  20/05/2021

Description: This design-build project was our first experience with Turner Construction, and has been a great success thus far. After we provided the design, Turner took over to break ground on this large fulfillment and distribution center for Personalized Skin Solutions, also affiliated with the popular skincare brand Curology. Being close to the airport, there were many different hurdles to get over involving the lift for our equipment. After coordinating with airport and local authorities, we were able to start our work on schedule. The design included a Unistrut grid ceiling, office space, compound labs, and distribution space for this quick-growing company.

Doughboy Apartments


General Contractor:   Nelcon Inc.

Architect: Desmone & Associates Architects; Terry Oden

Project Type:  Multi-Family Housing

Completion Date:  20/05/2021

2554 Smallman


General Contractor:  

Architect: 

Project Type: 

Completion Date: 

Atria Senior Living Facility


General Contractor:  Mistick Construction.

Architect:  PRDG, LLC

Project Type:  Senior Living Facility

Brewers Block


General Contractor:   DC

Architect:  Desmone

Project Type:  Multifamily

Range USA


General Contractor:  Rycon Construction, Inc.

Architect:  ESD Architecture, HELT Design

Project Type:  Retail

Cohatch Southside Works


General Contractor: Franjo Construction

Architect:  IKM Incorporated

Project Type:  Office Space

Radiance Fertility Clinic


General Contractor:  Citadel Construction Group

Size: 7,570 sq ft

Project Type:  Office Space

RIZE Sports


General Contractor:  Citadel Construction Group

Size:  57,220 sq ft

Project Type:  Recreational

Triangle Building


General Contractor: 

Size: 

Project Type: 

2912 East Carson Showroom


General Contractor: Franjo Construction Builders

Size:  11,492 sq ft

Project Type:  Desmone

Central Outreach Wellness Center


General Contractor:  Citadel Construction Group

Architect: WTW Architects

Size:  7,000 sq ft

Dick's House of Sport


General Contractor:  Rycon Construction

Architect:  Fox Design Group

Size:  148,000 sq ft